BARONEBruce Barone Jr.'s founder practiceIntelligence DeskPublic platformCivic BitcoinSeparately operatedSmart UrbanismIntelligence Desk research

Claim lineage · CLM-046

By the published calendar, Collier County Public Utilities' temporary free-chlorine interval reached its scheduled August 28 end date, while system flushing remained scheduled through September 18, 2026.

This is a date-derived status from the official notice, not a separate completion notice and not evidence of an outage or unsafe water.

Grade B · Primary locatordate derived utility statusAs of 2026-08-31
CANONICAL CLAIM
By the published calendar, Collier County Public Utilities' temporary free-chlorine interval reached its scheduled August 28 end date, while system flushing remained scheduled through September 18, 2026.
Evidence state
verified
Classification
date derived utility status
Claim date
2026-08-31
Material
Yes

Limit: This is a date-derived status from the official notice, not a separate completion notice and not evidence of an outage or unsafe water.

Source chain

1 record behind this claim.

A record-envelope hash proves the exact metadata reviewed by the Desk. “Document OPEN” means the underlying bytes still need preservation.

BPrimary locatorSRC-029 · V1

Collier County temporary water-disinfection and flushing notice

Official notice published July 14: disinfection change July 31-August 28 and flushing August 2-September 18

Envelope
ed5ed8d5ff812624b3dc20985ddc40d9f0d0ac978b22963fb7023118da14944b
Document
OPEN

Inspect source record Open V1 JSON

Correction state

No linked correction.

Later corrections never erase the prior wording from the lineage file.

Current lineage

No correction is linked to this claim as of the evidence cut.